Tanana River Bridge
This Bridge project is a 3,300 ft. long railroad bridge, 7,344 tons, that is part of the Northern Rail Extension connecting the North Pole with Delta Junction, Alaska. Fabrication of this bridge was by CRSBG, China.
Atema provided technical fabrication consultant services which included: US code interpretation and compliance; change orders; RFI’s; inspection and testing; and cost savings ideas to ensure the project was on time, within budget, and met or exceeded contract requirements.
During Fabrication, Atema provided CRSBG with training and consulting services in quality system improvement for their bridge production facility in Qinhuangdao.
The project was delivered five months early with only four project nonconformances.
Project Stats
Owner
AARC Alaska Railroad Corporation
Client
Kiewit Bridge & Marine Robert A. Elliott – Project Sponsor 2215 E 1st St. Vancouver, WA 98661 360-694-1201
Fabrication Facility
China Railway Shanhaiguan Bridge Group Co., Ltd. (CRSBG)
Project Dates
June 2011 – October 2012